DATA CENTRE
From optional to essential: FIBREROUTE in the 800G & 1.6T Era
We are witnessing a fundamental shift in data centre architecture. As the industry races toward 800G and the upcoming 1.6T era, the physical infrastructure defining our networks is under immense pressure.
DATA CENTRE
How AI is reshaping power, cabling, and connectivity in modern Data Centres
AI isn’t only transforming what happens inside data centres - it’s reshaping the facilities themselves. Surging power consumption, soaring rack densities, new cooling demands, ultra-high-speed networking, and the shift toward 800G and 1.6T infrastructure are redefining how data centres are designed and operated. This blog dives into how AI workloads are driving unprecedented changes in power, cabling, and connectivity requirements, and what organisations should prioritise when building an AI-ready backbone.
DATA CENTRE
Designing data centre racks for density, airflow, and peace of mind
Modern data centres face unprecedented pressure from AI compute, high-speed fabrics, edge deployments, and growing sustainability constraints. The result: hotter racks, more fibre terminations, and faster rollouts - without more space to work with. This blog explores how smart rack design, airflow discipline, and cable management strategies can make density sustainable while preserving serviceability and operational calm.
DATA CENTRE
Broadcom’s Tomahawk 6 and the Future of AI Data Center Cabling
Broadcom’s new 102.4 Tbps switch chip marks a major leap in data center networking, addressing bandwidth and latency bottlenecks as AI workloads scale. High-speed, low-latency infrastructure is now essential.
DATA CENTRE
Data Centre challenges – the AI dichotomy
AI is undeniably the latest buzzword, promising transformative potential across industries. However, as AI adoption accelerates, data centres are facing significant challenges to balance rising energy demands with efficiency gains.